摘要
矿井在建设过程中,一般建设周期长,安全存在较大风险,做为业主,往往在建设过程中只注重于建设结果,在过程中参与较少。巴彦高勒煤矿在建设过程中,打破以往的建井模式,注重了过程建设,从而达到了较好的建设效果,缩短了建设周期。
Coal mine in the process of construction, the general construction cycle is long, safe and there is a big risk, as the owner, often only pay attention to in construction in the process of construction as a result, the participation in the process is less, and I mine in the process of construction, breaking the previous build well patterns, pay attention to the process of construction, so as to achieve the good construction effect, shorten the construction cycle.
出处
《山东煤炭科技》
2015年第7期190-191,共2页
Shandong Coal Science and Technology
关键词
服务
模式
矿井
建设
service mode mine construction