超高层建筑临时用电施工技术 被引量:2

CONSTRUCTION TECHNOLOGY OF SUPER HIGH TEMPORARY ELECTRICITY
下载PDF
导出
摘要 北京绿地中心工程超高层建筑功能多元化,设备十分复杂,施工现场有大量的用电设备,且具有用电设备种类多、设备移动较频繁、负荷变动大以及临时使用等特点。在电气线路的敷设、电器元件、电缆的选配及电路的设置等方面存在短期行为,易使施工临时用电成为施工过程中容易发生安全事故的环节,因此超高层建筑施工临时用电现场更需要重视正确设置和防护方法,避免触电和电气火灾事故的发生,以推动用电安全。 Super high-rise buildings in Beijing Green Space Center project diversification, the equipment is very complex, the construction site is a large number of electric equipment, and the characteristics of electrical equipment, the more frequent, many kinds of equipment moving large load change, the temporary use of etc. Setup, selection and circuit cable laying, electrical components, electrical wiring in the presence of short-term behavior, easy, easy to make the construction temporary electricity safety accident prone to become a link in the process of construction, so construction of super high-rise building temporary electricity field should pay more attention to the correct installation and protective methods, avoid electric shock and electrical fire accident the occurrence, in order to promote the safe use of electricity.
出处 《建筑技术开发》 2015年第7期26-30,共5页 Building Technology Development
关键词 超高层建筑 临时用电 防护 安全用电 high rise buildings temporary electricity protection safety of electricity
  • 相关文献

参考文献2

二级参考文献2

  • 1GB50168-2006电气装置安装工程电缆线路施工及验收规范[S].
  • 2JGJ33-2001,建筑机械使用安全技术规程IS].

共引文献43

同被引文献7

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部