后浇带施工技术在混凝土结构工程的应用 被引量:1

The application of post pouring belt technology in concrete structure project
下载PDF
导出
摘要 龙岩国际商贸中心工程在施工中,根据工程施工条件和结构特点,对混凝土结构的后浇带分别采用无缝施工和超前止水技术。无缝施工技术的应用有效地控制了超长结构混凝土裂缝的开展;超前止水技术的应用避免了后浇带留置期间地下水的渗入。 Longyan International Trade Center is under construction. According to the construction conditions and characteristics, the seamless construction and advanced water sealing technology for concrete structures were adopted respectively. The application of seamless construction technology can effectively control the super long concrete structure crack, avoid the infiltration of groundwater in the retention period of post pouring belt, and thus achieve good social and economic benefits.
作者 邱仁宗
出处 《闽西职业技术学院学报》 2015年第2期117-119,共3页 Journal of Minxi Vocational and Technical College
关键词 混凝土 后浇带 膨胀加强带 超前止水 无缝施工 concrete post pouring belt expansion reinforcing band advanced water sealing seamless construction
  • 相关文献

参考文献3

  • 1中华人民共和国建设部 国家质量监督检验检疫总局.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.17.
  • 2中华人民共和国住房和城乡建设部.GB50108--2008地下工程防水技术规范[s].北京:中国计划出版社,2008.
  • 3中华人民共和国建设部.GB/T50081-2002普通混凝土力学性能试验方法标准[S].北京:中国建筑工业出版社,2003.

共引文献303

同被引文献1

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部