摘要
论述了KJ826矿压监测系统的特点,结合惠阳煤业15号煤层赋存特征和采掘巷道布置特点,确定了15101工作面和15103工作面矿压布置方案。
This paper discussed the characteristics of KJ826 mine pressure monitoring, and determine the reasonable mine pressure construction sequence in 15101 and 15103 face combined with characteristics of occurrence and mining roadway layout 15# coal seam in Huiyang Coal Industry.
出处
《能源与节能》
2015年第7期112-113,共2页
Energy and Energy Conservation
关键词
施工管理
节点
施工工序
construction management
node
construction process