摘要
The paper proposes a projected management method to organize,select and rolling configure the projects for multiple strategic stages. We illustrate the definitions of project portfolio rolling benefits,gain of resources and risk accumulation according to the correspondence between project life cycle and phased strategy scenarios. A heuristic-genetic algorithm has been designed to optimize the configuration model at the same time.The rolling configuration model and optimization algorithm are proved effectively by testing the case study of Y enterprise through the Matlab simulation.
The paper proposes a projected management method to organize,select and rolling configure the projects for multiple strategic stages. We illustrate the definitions of project portfolio rolling benefits,gain of resources and risk accumulation according to the correspondence between project life cycle and phased strategy scenarios. A heuristic-genetic algorithm has been designed to optimize the configuration model at the same time.The rolling configuration model and optimization algorithm are proved effectively by testing the case study of Y enterprise through the Matlab simulation.
基金
supported by National Natural Science Foundation of China under Grant No.71172123
Aviation Science Fund under Grant No.2012ZG53083