摘要
湖南醴茶31标SMA-13上面层结构选用多孔玄武岩集料,通过室内试验分析和现场施工情况,提出了其在配合比设计和施工过程中从拌合、运输到摊铺碾压需控制的一些问题,并总结了多孔玄武岩在SMA上面层应用的施工工艺参数和控制要点。
Porous basalt aggregate is selected for SMA-13 upper layer structure in No. 31 contract section in Licha of Hu 'nan,this paper puts forward some problems by laboratory testing analysis and site construction,including mix design,mixing,transportation and paving,rolling in construction,summarizes the construction process parameters and control points in the application of porous basalt in upper layer of SMA pavement.