期刊文献+

BIM技术在多哈大桥施工管理中的应用 被引量:35

Application of BIM Technology in the Construction Management of Doha Bridge
下载PDF
导出
摘要 为更好地实现精细化管理,基于卡塔尔多哈大桥项目,建立了桥梁BIM细致模型,通过数字化仿真模拟技术,进行了基于BIM技术的多哈大桥安装施工、穿筋施工、落位施工及预应力张拉施工仿真模拟,从而更好地指导桥梁复杂工艺的施工;建立多哈大桥BIM数据库及资料库,并基于VDC技术,进行了多哈大桥预应力专项施工管理平台的二次开发,该平台可操作性强、高效快捷。实践证明,通过BIM技术的应用,大大提高了桥梁结构的施工效率,节约了时间与成本,实现了桥梁工程中的信息化管理。 In order to realize fine management, based on the Doha bridge in Qatar, the BIM meticulous model of the bridge is established. Then, with the help of digital simulation and BIM technology, all kinds of construction technology are used to help guiding the bridge construction including installation construction, inserting rebar construction, putting down construction and prestressing force tension construction. Finally, based on the VDC technology, the BIM database of the Doha bridge are built, the prestressed special construction management platform of Doha bridge is developed. The platform is easy to operate, and also makes it fast. After practicing, we get a conclusion, the BIM technology can improve a lot of efficiency of construction, it can also save time and money, the information management in the bridge engineering is realized.
出处 《施工技术》 CAS 北大核心 2015年第12期76-80,共5页 Construction Technology
基金 北京市科技新星计划(xx2014B085)
关键词 信息化 桥梁工程 建筑信息模型 管理平台 information bridges building information modeling (BIM) management platform
  • 相关文献

参考文献9

二级参考文献33

  • 1张昆.基于BIM应用的软件集成研究[J].土木建筑工程信息技术,2011,3(1):37-42. 被引量:28
  • 2张建平,韩冰,李久林,卢伟.建筑施工现场的4D可视化管理[J].施工技术,2006,35(10):36-38. 被引量:32
  • 3Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
  • 4Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
  • 5Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
  • 6Li H, Guo H L, Skitmore M, Huang T, Chan N, Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong[J]. Construction Management and Economics, 2011, 29 ( 3 ): 233-245.
  • 7Guo H L, Li H, Skitmore M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, ASCE, 2010, 26 (1): 41 47.
  • 8Guo H L, Li H, Chan G, Skitmore M. Using game technologies to improve the safety of construction plant operations[J]. Accident Analysis and Prevention, 2012, 48: 204-213.
  • 9刘占省,李占仓,徐瑞龙.BIM技术在大型公用建筑结构施工及管理中的应用[C].第四届全国钢结构工程技术交流会论文集.2012.
  • 10Chris Allen, John Smallwood. Improving construction planning through 4D Planning[J]. Journal of Engineering, Design and Technology, 2008, 6(1): 7-20.

共引文献356

同被引文献147

引证文献35

二级引证文献265

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部