期刊文献+

美国高承载率车道拥挤收费方案建模 被引量:5

Modeling High-occupancy/toll Lanes in US
下载PDF
导出
摘要 近年来HOT车道(即高承载率车道拥挤收费方案)已成为美国重要的道路拥挤收费策略.为引鉴其实施经验和管理理论,首先介绍了HOT车道概念与特征,然后采用交通行为建模方法构建了HOT车道管理者与出行者互馈决策的双层规划模型.上层模型模拟管理者的定价策略;下层交通均衡模型模拟个体出行者根据收费水平和交通状态变化而调整出行选择的行为.根据实施方案和应用条件,设计算例分析评价18种可能情形下HOT车道的拥挤管理效果.结果表明,较传统拥挤管理策略,HOT车道缓堵效果更高;同类出行者假设可能会低估HOT车道的缓堵效果;不同的政策目标下HOT车道的实施效果差异显著. High occupancy/toll lanes(HOT) have become an increasingly popular countermeasure to manage the highway congestion in US. In order to draw lessons from the experiences and theories of HOT lanes, the paper presents the concept and literature of HOT lanes, and then establishes a bi- level programming model to simulate the interactions between the HOT lane operators and users. The upper-level model simulates how the operators develop the pricing strategies with various objectives, and the lower-level model addresses how the individual travelers respond to the price strategies and traffic conditions. The paper designs eighteen scenarios to analyze the highway performances of various HOT operations. Results show that, HOT lanes show better congestion-mitigating effects than the conventional measures; the homogeneity assumption tends to underestimate the effectiveness of HOT lanes; and different policy objectives have significant influences on the HOT lane operations.
作者 范文博
出处 《交通运输系统工程与信息》 EI CSCD 北大核心 2015年第3期204-213,共10页 Journal of Transportation Systems Engineering and Information Technology
基金 国家自然科学基金(71271176 71473207) 中央高校基本科研业务科技创新项目(2682015CX042)
关键词 公路运输 交通拥挤管理 双层规划模型 高承载率车道 拥挤收费 highway transportation traffic congestion management bi-level programming model high-occupancy vehicle lane congestion pricing
  • 相关文献

参考文献16

  • 1李开国.特大城市机动车增长与分布特征研究[J].交通与运输,2013,29(H12):1-4. 被引量:6
  • 2Fhwa (Federal highway administration). Valuepricing pilot programme[OL], (2014-10-27) [2014-12-26]. http : // www . ops.fhwa. dot.gov / tolling_pricing /value—pricingA.
  • 3Poole R W, Orski C K. HOT Networks: A new plan forcongestion relief and better transit[R]. Los Angeles:Reason Public Policy Institute, 2003.
  • 4Pravin Varaiya,韩慧敏.加利福尼亚州车辆合乘系统运行效果[J].城市交通,2010,8(4):79-93. 被引量:7
  • 5Fhwa (Federal highway administration). HOT lanes,cool facts[0L], (2013- 8- 2) [2014- 12-26]. http://www. ops. fhwa. dot. gov / publications / fhwahop 12031/fhwahop 12027/index.htm.
  • 6Fhwa (Federal highway administration). Considerationsfor high occupancy vehicle (HOV) lane to highoccupancy toll (HOT) lane conversions guidebook[R).Washington DC: Federal Highway Administration, 2007.
  • 7Small K A, Yan J. The value of "Value Pricing"of roads second- best pricing and productdifferentiation[J]. Journal of Urban Economics, 2001,49: 310-336.
  • 8Lou Y, Yin Y, Laval J A. Optimal dynamicpricing strategies for high- occupancy/toll lanes[J].Transportation Research Part C,2011, 19: 64-74.
  • 9Burris M W, Ungemah D H, Mahlawat M, et al.Investigating the impact of tolls on high-occupancy-vehicle lanes using managed lanes[J]. TransportationResearch Record, 2009,2099: 113-122.
  • 10Light T. High occupancy toll lane performance underalternative pricing policies[J]. Journal of TheTransportation Research Forum, 2012, 51(2): 61-82.

二级参考文献22

  • 1Legislative Analyst's Office.HOV Lanes in California:Are They Achieving Their Goals?[EB/ OL].2000[2004-07-07].http://www.lao.ca.gov/ 2000/010700 hov/010700 hov lanes.html.
  • 2Freeway Performance Measurement System (PeMS)[EB/OL].2005[2006-06-21].http://pems.eecs.berkeley.edu.
  • 3Chen C,Kwon J,Skabardonis A,Varaiya P.Detecting Errors and Imputing Missing Data for Single Loop Surveillance Systems[J].Transportation Research Record,2003(1855):160-167.
  • 4California Department of Transportation,Division of Traffic Operations.High Occupancy Vehicle Guidelines[EB/OL].2003[2006-07-08].http://www.dot.ca.gov/hq/traffops/systemops/hov/hov_sys/guidelines/.
  • 5Public Law 109-59.Safe,Accountable,Flexible,Efficient Transportation Equity Act:A Legacy for Users(SAFETEA-LU)[S/OL].Washington DC:US House of Representatives,2005[2006-07-13].http://www.washingtonwatchdog.org/documents/ cong_reports/house/109/housereport109_203.html.
  • 6Kwon J.HOV Lane Operation and the Impact of Introducing Hybrids Vehicles to HOV lanes in California[R].California:California Department of Transportation,2005.
  • 7Washington Post.The Hybrid's Free Ride[EB/OL].2005[2005-06-21].http://www.washingtonpost.com/wp-dyn/articles/A12607-2005Jan15.html.
  • 8Fast Lane,Spring 2005 Issue[EB/OL].2005[2005-06-22].http://managed-lanes.tamu.edu.
  • 9Tierney J.The Road to Hell is Clogged with Righteous Hybrids[N].NY Times,2005-08-30(option).
  • 10Jia Z,Varaiya P,Chen C,Petty K and Skabardonis A.Maximum Throughput in LA Freeways Occurs at 60 mph[J/OL].2001[2006-07-08].http://pems.eecs.berkeley.edu/Resources/Papers/throughput4.pdf.

共引文献10

同被引文献21

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部