基于仿真的船舶分段建造动态空间调度 被引量:4

Simulation-based Ship Block Building Dynamic Spatial Scheduling
下载PDF
导出
摘要 为缩小船舶分段空间调度计划与实际作业安排之间的差别,提出了一种基于仿真的船舶分段建造动态空间调度方法。针对分段建造的不同阶段,在分析影响因素的影响形式基础上提出了动态调整策略,包括定位延时策略、进度控制策略和吊运等待策略,调整分段建造过程以适应影响因素的作用。构建了船舶分段建造仿真模型,实现了分段建造在影响因素作用下动态空间调度的仿真。以实际数据为输入进行仿真分析,结果表明,该方法制定的调度计划与实际作业情况接近,且能够为分段生产计划优化调整提供指导。 To reduce the difference among ship block spatial scheduling results and actual working assignments,a simulation-based dynamic spatial scheduling method was proposed. According to differ- ent stages of ship-block building and analyzing the influence forms of affecting factors, three dynamic adjustment strategies were put forward, including positioning delay strategy,progress control strategy and swing waiting strategy. With these strategies,the ship-block building processes could be adjusted so as to adapt to affecting factors. A ship bloek building simulation model was developed to realize the dynamic spatial scheduling simulation under the influence of affecting factors. The simulation results indicate that the proposed method can reduce the difference between the scheduling plan and actual working ones, and can provide guidance to optimize ship-block building production plan.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2015年第14期1900-1907,共8页 China Mechanical Engineering
基金 国防基础科研项目(A0720133009)
关键词 船舶分段 空间调度 仿真 优化 ship block dynamic spatial scheduling simulation optimization
  • 相关文献

参考文献15

二级参考文献54

  • 1段海滨,王道波,朱家强,黄向华.蚁群算法理论及应用研究的进展[J].控制与决策,2004,19(12):1321-1326. 被引量:211
  • 2潘徐杰,蒋志勇.中间产品纳期计划研究[J].船舶工程,2006,28(6):37-40. 被引量:2
  • 3郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. 被引量:11
  • 4多里戈,施蒂茨勒.蚁群优化[M].张军,等译.北京:清华大学出版社,2007:215-232.
  • 5Lee J K,Lee K J, Park H K, etal. Developing scheduling systems for Daewoo shipbuilding: DAS project [J]. European Journal of Operational Research, 1997, 97(2) :380-395.4.
  • 6Cho K K, Chung K H, Park C, etal. A spatial scheduling system for block painting process in shipbuilding [J].CIRP Annals-Manufacturing Technology, 2001, 50(1) :339-342.
  • 7Park C, Chung K H, Park J C, etal. A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project [J]. Production Planning & Control, 2002,13(4) :4342-4354.
  • 8Varghes R J, Yoon D Y. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm [C]// 3rd IEEE International Conference on Industrial Informatics. India: [s. n.], 2005:444-449.
  • 9Li B, Zhan Z Y, Li G. A dynamic scheduling method for spatial layout planning [C]//Proceedings of the Fourth International Conference on Machine Learning and Cybernetics. Guangzhou: [s. n. ] ,2005 : 18-21.
  • 10Eom C H, Jang J H, Koh S G. Block assembly scheduling in shipbuilding company EC3//Proceedings of the 37th International Conference on Computers and Industrial Engineering. Egypt:[ s. n. ], 2007,10 : 20-23.

共引文献55

同被引文献44

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部