平朔东露天矿南帮滑坡治理方案 被引量:1

South slope landslide treatment plan in Pingshuo East Open-pit Mine
下载PDF
导出
摘要 南帮滑坡对平朔东露天矿的正常生产造成了很大的影响,北京科技大学提出的治理方案一方面没有考虑矿坑的生产实际,另一方面煤量损失较大。在北科大方案的基础上,尽快完成滑坡区域治理的同时尽量多的开采原煤,使经济效益最大化。 South slope landslide caused great effect on normal production in Pingshuo East Open-pit Mine. University of Science and Technology Beijing presented the treatment scheme, which didn't consider the actual production in the coal mine on the one hand and caused coal loss on the other hand. On the basis of the scheme, the mine completed landslide areas treatment as soon as possible, mined raw coal as much as possible to make economic benefits maximized.
出处 《露天采矿技术》 CAS 2015年第7期1-3,共3页 Opencast Mining Technology
关键词 南帮滑坡 治理 优化方案 south slope landslide treatment optimazation scheme
  • 相关文献

参考文献3

  • 1中煤西安设计工程有限责任公司.平朔煤炭工业公司东露天煤矿初步设计说明书[R].西安:中煤西安设计工程有限责任公司,2008:3-2.
  • 2周寿昌,杜竞中,郭增涛,等.露天矿边坡稳定[M].徐州:中国矿业大学出版社,1990,12.
  • 3丁立明,才庆祥,刘雷,马力,周伟.软弱夹层对露天矿边坡稳定性的影响[J].金属矿山,2012,41(4):40-42. 被引量:34

二级参考文献2

共引文献53

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部