摘要
为了解决北帮搬迁滞后给生产组织带来的困难,对开采方案进行优化研究,提出了扇形开采方式,以解决矿坑向前推进、工艺系统布置、内排空间释放等相关问题。通过分析研究,得出围绕岩石半连续系统转向方案,方案的实施能够合理处理好生产组织关系,保证生产接续平稳。
In order to solve the difficulties brought by north slope relocation lag, the article researches and optimizes the mining scheme, and presents sector mining method to solve forward advance, technology system layout and inner dump space release problems. Through research, the author gets semi-continuous system steering scheme around rock, which can deal with the relation of production and organization and ensure the following smooth production.
出处
《露天采矿技术》
CAS
2015年第7期14-16,20,共4页
Opencast Mining Technology
关键词
搬迁滞后
转向
生产组织
relocation
lag
steering
production organization