摘要
针对脱硫溶硫房整个楼层的墙体出现较大裂缝的现象,分析产生裂缝的原因,提出解决问题的两种技术改造方案,通过的技改方案的对比,采取在容碱槽设备的支座处增加弹簧减振器的技术改造措施,取得了较好的技改效果。
For the desulfurization of sulfur dissolving real the entire floor of the wall appear larger crack phenomenon, cause analysis of cracracksin, putforward to solve the problem of two technical transformation scheme, through the technological transformation scheme comparison, take springshock absorberoftechnical transformation measures increase in alkatibath equipmentsupport, and achievedbetter technical effect
出处
《科技风》
2015年第15期108-108,共1页
关键词
溶碱槽
技改
振动
减振器
alkali bath
technological transformation
vibration
shock absorber