摘要
根据无线调车机车信号和监控系统(STP)在青岛电务段的建设和实际应用情况,对该系统设备建设过程中的施工流程、开通后的维护管理进行分析总结,针对各环节上存在的盲区进行梳理并提出改进建议,为后续STP系统的建设、运用和维护积累经验。
According to the constriction and application of the wireless shunting locomotive signal and monitoring system,i.e.STP,in the Qingdao department of CS services,This paper analyzes and summarizes the construction process and maintenance management of the system after it has been put into practical application.Blind zones in the process steps are figured out and some suggestions for improvement are also put forward,which accumulates experiences for the construction,operation and maintenance of follow-up STP systems.
出处
《铁道通信信号》
2015年第6期7-9,共3页
Railway Signalling & Communication
关键词
无线调车机车信号和监控系统
STP
施工流程
维护管理
Wireless shunting locomotive signal and monitoring system
Shunting Train Protection
Construction process
Maintenance management