工程造价中措施费的控制研究 被引量:2

On control over measure expense in engineering cost
下载PDF
导出
摘要 由于建设工程造价中措施项目存在"无设计、非实体、不保留、无统一执行标准"等特点,参与确定工程造价的各方对其存在很大争议,针对该问题,按照工程建设的不同阶段,分别论述了确定措施费用工作中各方需完成的主要工作目标、完成方法及需取得的工作成果等,以供参考。 According to some features of the measure programs in construction engineering cost with "no design, entity, reservation and unified implementation standards", the paper takes part in the identification for the controversial issues among different parties in the engineering cost, and indicates the main working aims, complete methods, and working results in the identification for the measure expenses according to various stages of the engineering construction, so as to provide some reference.
作者 韩洋
出处 《山西建筑》 2015年第22期212-213,共2页 Shanxi Architecture
关键词 工程造价 措施费 建设阶段 工作成果 engineering cost, measure expense, construction stage, working result
  • 相关文献

参考文献3

  • 1GB50500-2013,建设工程工程量清单计价规范[S].
  • 2山西省建设工程计价依据--建设工程费用定额(2011)[Z].
  • 3JF-2006-0001,山西省建设工程施工合同[Z].

共引文献85

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部