摘要 渠道石方明挖爆破施工具有安全要求高和施工过程必需严格控制的特点,因此,必需进行专业的爆破设计,且经过由本专业的专家进行论证及爆破试验后,才能进行施工.本文对廖坊灌区二期工程东干渠Ⅱ标中渠道石方明挖爆破设计及施工进行了介绍. The blasting constraction of the open cutting rock for channels has the characteristics of high safety requirements and its construction process must be strictly controlled. Before construction, the professional blasting design is required. And after specialist demonstration and blasting tests, the blasting construction can be carried out. The design and construction for the blasting on the open cutting rock of the east canal Ⅱ bidding of the second phase project for Liaofang Irrigation Area is introduced in this paper.
作者 熊保根
出处 《江西水利科技》 2015年第3期190-193,共4页 Jiangxi Hydraulic Science & Technology
关键词 石方明挖 爆破 设计 施工 廖坊灌区 Open cutting rock Blasting Design Construction Liaofang Irrigation Area
  • 相关文献

参考文献3

  • 1DL/T5135-2001,水利水电工程爆破施工技术规范[S].
  • 2DL/T5389-2007,水工建筑物岩石基础开挖工程施工技术规范[S].
  • 3GB 6722-2011,爆破安全规程[S].