期刊文献+

面向产品族优化时间窗下可重入批处理机调度 被引量:7

Family-oriented to Optimize Scheduling Problem of Re-entrant Batch Processing Machine with Due Window
下载PDF
导出
摘要 在半导体晶圆制造系统中,具有不确定交货时间窗和不相容产品族的可重入批处理机优化调度是NP-难问题。针对该问题,提出面向产品族的三层滚动混合整数线性规划模型的优化调度算法,其优化目标是提前和误工的时间总和最小。该算法是基于时间序列模型和事件模型的混合分解策略,在可重入批处理机空闲、可用的事件触发下,将整个调度时间轴分解为滚动的时间域;每个时间域对应一个子问题;每个子问题分解为三层:排序、派工和更新;半导体晶圆制造系统实时调度仿真平台用于派工、更新和时域滚动,混合整数线性规划模型用于排序。通过6种典型情形实例验证,结果表明面向产品族的三层滚动混合整数线性规划模型能够在较短计算时间内获得较好优化解。 In the semiconductor wafer fabrication system, for re-entrant batch processing machine with distinct due window and incompatible families, the scheduling problem is known to be NP-complete. Three-phase rolling mixed integer linear programming algorithm is proposed. According to time-sequence-based and event-based combined decomposition strategy, the whole simulation time is decomposed into different rolling horizons. A horizon is corresponding to a sub-problem. Each sub-problem is divided into three phases:Sequencing, dispatching and updating. The real-time scheduling simulation platform and mixed integer linear programming are used to solve dispatching, updating, rolling and sequencing, respectively. 6 representative examples are conducted. The results show that family-oriented three-phase rolling mixed integer linear programming algorithm can obtain better solutions in less computation time.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2015年第12期192-201,共10页 Journal of Mechanical Engineering
基金 国家科技重大专项资助项目(2011ZX02501-005)
关键词 不确定交货时间窗 面向产品族 可重入批处理机 三层滚动混合整数线性规划 distinct due window family-oriented re-entrant batch processing machine three-phase rolling mixed integer linear programming
  • 相关文献

参考文献17

  • 1MEHTA S V, UZSOY R. Minimizing total tardiness on a batch processing machine with incompatible job families[J]. IIE transactions, 1998, 30(2): 165-178.
  • 2张怀,江志斌,郭乘涛.面向瓶颈的半导体晶圆制造系统派工策略及参数优化[J].上海交通大学学报,2007,41(8):1252-1257. 被引量:10
  • 3MIN H S, YIH Y. Development of a real-time multi-objective scheduler for a semiconductor fabrication system[J]. International Journal of Production Research, 2003, 41(10): 2345-2364.
  • 4MATHIRAJAN M, SIVAKUMAR A. A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor[J]. The International Journal of Advanced Manufacturing Technology, 2006, 29(9): 990-1001.
  • 5POTTS C N, KOVALYOV M Y. Scheduling with batching: A review[J]. European Journal of Operational Research, 2000, 120(2): 228-249.
  • 6李程,江志斌,李友,李娜,耿娜,姚世清,贾文友.基于规则的批处理设备调度方法在半导体晶圆制造系统中应用[J].上海交通大学学报,2013,47(2):230-235. 被引量:6
  • 7JIA Wenyou, JIANG Zhibin, LI You. Closed loop control-based real-time dispatching heuristic on parallel batch machines with incompatible job families and dynamic arrivals[J]. International Journal of Production Research, 2013, 51(15): 4570-4584.
  • 8JIA Wenyou, JIANG Zhibin, LI You. A job-family-oriented algorithm for re-entrant batch processing machine scheduling[C]//IAutomation Science and Engineering (CASE), 2013 IEEE International Conference. 2013: 1022-1027.
  • 9张洁,张朋,刘国宝.基于两阶段蚁群算法的带非等效并行机的作业车间调度[J].机械工程学报,2013,49(6):136-144. 被引量:36
  • 10SCHRAGE L. Formulation and structure of more complex/realistic routing and scheduling problems[J]. Networks, 1981, 11(2): 229-232.

二级参考文献29

  • 1张怀,江志斌,郭乘涛,刘惠然.基于EOPN的晶圆制造系统实时调度仿真平台[J].上海交通大学学报,2006,40(11):1857-1863. 被引量:6
  • 2张怀,江志斌,郭乘涛.面向瓶颈的半导体晶圆制造系统派工策略及参数优化[J].上海交通大学学报,2007,41(8):1252-1257. 被引量:10
  • 3Uzsoy R,Lee C Y,Martin-vega L A.A review of production planning and scheduling models in the semiconductor industry.Part Ⅱ:Shop-floor control[J].IIE Transactions,1994,26(5):44-55.
  • 4Wein L M.Scheduling semiconductor wafer fabrication[J].IEEE Transactions on Semiconductor Manufacturing,1988,1(3):115-130.
  • 5Kumar P R.Scheduling semiconductor manufacturing plants[J].IEEE Control Systems Magazine,1994,14(6):33-40.
  • 6Glassey C R,Resende M G C.Closed loop job release control for VLSI circuit manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,1988,1(3):36-46.
  • 7Nakata T,Matsui K,Miyake Y,et al.Dynamic bottleneck control in wide variety production factory[J].IEEE Transactions on Semiconductor Manufacturing,1999,12 (3):273-280.
  • 8Liu Hui-ran,Fung R Y K,Jiang Zhi-bin.Modeling of semiconductor wafer fabrication systems by extended object-oriented Petri nets[J].International Journal of Production Research,2005,43 (3):471-495.
  • 9NIST/SEMATECH.NIST/SEMATECH e-handbook of statistical methods[DB/OL].(2005-11-09)[2006-06-30].http://www.itl.nist.gov/div898/handbook/.
  • 10Harrington E C.The desirability function[J].Industrial Quality Control,1965,21 (10):494-498.

共引文献48

同被引文献61

引证文献7

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部