吹瓶模具制造企业面向负荷均衡的订单预投决策方法 被引量:1

Preorder decision method for bottle blowing mould manufacturing enterprises based on load balancing
下载PDF
导出
摘要 针对吹瓶模具制造企业因订单到达的随机性、模具类别的差异性导致各生产车间负荷均衡性差、资源利用率低的问题,采用预投订单方式来均衡各生产车间的负荷。基于吹瓶模具制造企业的生产计划体系,设计了一套针对吹瓶模具制造企业的预投订单的决策模型。实践表明,在吹瓶模具制造企业,采用预投订单能很好地均衡负荷、平衡产能以及提高各加工设备的利用率,提高订单准时交货率,降低企业的生产成本。 In blowing mould manufacturing enterprises, due to the randomness of the order arriving, difference of blow moulding moulds, the load of workshops was unbalanced and the resource availability was low, which taking the preorder method can solve the problem.Based on the production plan of an enterprise, a set of decision model for preorder was designed. The practice proved that the bottle blowing mould manufacturing enterprise hadbalanced capacity, load balancing and improved the processing center of resource utilization by using of preorders.
出处 《模具工业》 2015年第7期5-13,共9页 Die & Mould Industry
基金 基于排队网的定制装备制造系统资源优化配置(51375098) 模具制造系统负荷均衡化与生产进度控制方法研究(51175094)
关键词 吹瓶模具 预投订单 负荷控制 优化路径 仿真建模 blow moulding mould preorder work load control routing optimization simulation modeling
  • 相关文献

参考文献12

二级参考文献47

  • 1李葆文.设备前期管理(四) 第二讲 设备的规划、投资效益分析与选型(续二)[J].设备管理与维修,2004(7):42-44. 被引量:3
  • 2张人千.随机需求环境下的作业能力规划模型研究[J].计算机集成制造系统,2006,12(9):1359-1366. 被引量:4
  • 3陈庆新,陈新度,张平,陈新.制造网格环境下项目的自组织协商与协调[J].计算机集成制造系统,2006,12(10):1683-1692. 被引量:6
  • 4PARK C, SONG J, KIM J G, et al. Delivery date decision support system for the large scale make to order manufacturing companies[J]. Production Planning & Control, 1999, 10 (10):585-597.
  • 5KINGSMAN B G. Modelling input output workload control for dynamic capacity planning in production planning systems[J]. International Journal of Production Economics, 2000,68 (1):73-93.
  • 6CORTI D, POZZETTI A, ZORZINI M. A capacity-driven approach to establish reliable due dates in a MTO environment [J]. International Journal of Production Economics, 2006,104 (2) ,536-554.
  • 7WORDEN L, WILSON E, KINGSMAN B G, et al. Integrating marketing and production planning in make-to-order companies[J]. International Journal of Production Economies, 1993,30/31(1) :53-66.
  • 8KINGSMAN B G, MERCER A. Strike rate matrices for integrating marketing and production during the tendering process in make-to-order subcontractors [J]. International Transaction Operational Research, 1997,4(1) :251-257.
  • 9STEVENSON M, HENDRY L. Aggregate toad-oriented workload control: a review and a re-classification of a key approach[J]. International Journal of Production Economics, 2006,104(2) :676-693.
  • 10WIGHT O W. Input/output control: a real handle on lead times[J]. Production and Inventory Management, 1970, 11(3) :9-30.

共引文献35

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部