西南某大型引水工程关键地质问题初步研究 被引量:7

Preliminary study on key geological problems of a large-scale water diversion project in Southwest China
下载PDF
导出
摘要 西南某大型引水工程地处我国青藏高原南缘,输水总干渠长达660 km,跨越3个一级大地构造单元,地质构造背景与地震地质条件复杂。为论证工程的可行性,结合工程可行性研究阶段成果,对线路区穿越活动性断裂建筑物的抗震与抗剪断问题、隧洞涌水突泥与地下水环境影响问题、深埋隧洞关键地质问题、软岩等特殊岩土工程地质问题等进行了初步研究。结果表明,这些关键地质问题在部分线路段较为突出,但均可通过工程措施予以解决。对后续深化研究工作提出了相关建议。 A large - scale water diversion project located in south edge of Qinghai - Tibet plateau is 660 km long, which stret- ches over three geotectonic units of first - level, so its tectonic setting and earthquake condition are complex. In combination with the stage results in feasibility study, we carry out several preliminary studies on the following issues: anti - seismic and anti - shear problems of buildings in the areas of route passing across active faults, water inrush of tunnel and underground water envi- ronment problem, geological problems of deep buried tunnels, engineering problems of soft rock and other special geo - mechan- ics. The analysis results demonstrate that the above mentioned problems are prominent in local sections and could be solved by engineering measures. We put forward suggestions for further study.
出处 《人民长江》 北大核心 2015年第14期16-18,44,共4页 Yangtze River
关键词 输水线路 深埋隧洞 软岩大变形 特殊岩土 water diversion route deep buried tunnel large deformation of soft rock special soil
  • 相关文献

参考文献4

  • 1张继勋.深埋长大引水隧洞主要工程地质问题及处理方法研究[C]//第一届水工岩石力学会议论文,郑州,2005.
  • 2姜云,李永林,李天斌,王兰生.隧道工程围岩大变形类型与机制研究[J].地质灾害与环境保护,2004,15(4):46-51. 被引量:95
  • 3铁路隧道超前地质预报技术指南(铁建设[2008]105号)[S].2008.
  • 4湖北省质量技术监督局.DB42/T561-2009公路隧道施工地质预报规程[S].

二级参考文献4

共引文献96

同被引文献174

引证文献7

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部