摘要
金坪子滑坡距离乌东德水电站坝址不足1km,在电站前期工程勘察阶段即发现滑坡体存在位移迹象,因此有必要对其展开全面监测和分析。在对滑坡体地形地貌和地质构造详细勘察的基础上,将滑坡体划分为5个变形区,并合理布设了一系列监测设施以分析滑坡体的地表位移、深部位移、裂缝变形等。监测结果表明,金坪子滑坡重点监测区域(Ⅱ区)存在严重蠕滑,滑带明显,其位移变形速率与滑坡所处位置降雨量存在明显的正相关性,且约滞后于降雨1-2个月。
The Jinpingzi landslide is less than 1 kilometer away from the dam site of Wudongde Hydropower Station, and de- formation was found during the preliminary exploration stage of the construction, so it is necessary to carry out comprehensive mo- nitoring and analysis. On the basis of detailed investigation of the topography and geomorphology and geological structure of the Jinpingzi landslide, the landslide body was divided into 5 deformation areas, and a series of monitoring facilities were reasonably arranged to analyze the surface displacement, deep displacement and crack deformation. The monitoring results show that a seri- ous creep phenomenon existed in the key monitoring area ( District Ⅱ) of the landslide and the landslide zone was obvious; there was a positive correlation between the landslide displacement deformation rate and the local rainfall, and the landslide generally lagged behind the rainfall for 1 - 2 months.
出处
《人民长江》
北大核心
2015年第14期91-93,共3页
Yangtze River
关键词
变形监测
降雨量
裂缝变形
金坪子滑坡
乌东德水电站
deformation monitoring
rainfall
crack deformation
Jinpingzi landslide
Wudongde I-lydropower Station