在枕头坝一级水电站建设期,国电大渡河枕头坝水电建设有限公司以安全、进度、质量、投资、环保"五控制"为抓手,加强目标管理和精细化管理,以投资控制为重点,以提高工程质量和效益为中心,达到了预期的效果,为下一步生产运营打下了工作基础。
During the construction of Zhentouba I Hydropower Station, Guodian Dadu River Zhentouba Hydropower Construction Company takes the "Five Controls" of safety, schedule, quality, investment and environmental protection as starting point to strengthen objective management and meticulous management, in which, the investment control is the focal point, and the project quality and efficiency improvements are core. The management achieves desired results and lay a good basis for following operation of station.