枕头坝一级水电站定子铁芯组装工艺 被引量:1

Stator Core Assembly Process of Hydro-generators in Zhentouba I Hydropower Station
下载PDF
导出
摘要 枕头坝一级水电站4号机组定子铁芯采用穿心螺杆压紧、双鸽尾键定位。铁芯冲片采用单片一叠,交错搭接的叠片方式。叠片时分段压紧,并通过液压千斤顶对定子铁芯进行整体压紧。经实践证明,此定子组装工艺是可靠的。 The stator core of Unit 4 hydro-generator in Zhentouba l Hydropower Station is compacted by mandrel screws and positioned through double dovetail keys. The core punching is laminated by single-chip and overlapping manner, and the laminated core is compacted by a section way and then compacted by hydraulic jack to achieve an overall compression. The practice has proved that the assembly process of stator is reliable.
作者 熊玺 时寒冰
出处 《水力发电》 北大核心 2015年第8期91-92,111,共3页 Water Power
关键词 定子装配 铁芯 叠片 浮动结构 枕头坝一级水电站 stator assembly core laminate floating structure Zhentouba I Hydropower Station
  • 相关文献

参考文献2

  • 1陈造奎.水力机组安装与检修[M].北京:中国水利水电出版社,1998.
  • 2SD287-88,水轮发电机定子现场装配工艺导则[S].中华人民共和国能源部批准,1988.

共引文献4

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部