3J. Corella, J.M. Toledo. Incineration of Doped Sludges in Fluidized Bed. Fateand Partitioning of Sic Target Heavy metals. I.Pilot Plan Used and Results[J]. Mater,2000,80(1):81-105.
4J. Tixier, G. Dusserre, O. Salvi, D. Gaston. Rewiew of 62 Risk Analysis Methodologies of Industrial Plants [J].Journal of Loss Prevention in the Proces indusoies, 2002:291-303.
5Y. Bultel, M. Aurousseau, P. Ozil, L. Pert'in. Risk Analysis on a Fuel Cell Inelectric Vehicle Using the MADS-MOSAR Methodology[J].Process Safety and Emoironmental Protection,2007,85(3):241-250.
6F.I.Khan, S.A. Abbasi. Techniques and Methodologies for Risk Analysis in Chemical Process Industries[J]. Journal of Loss Prevention in the Proces indusoies, 1998:261-277.