摘要
桥梁高墩的施工过程需要做好塔吊的安装和墩柱的施工,塔吊的安装需要打好根基,并合理安装塔吊附墙架,进而保证安装操作的安全性;墩柱的施工要求施工人员适当选用施工方式,从而保证桥梁高墩施工的质量。
The construction of high pier bridge construction process requires a tower crane installation and pier, tower crane installation needs to lay a good foundation, and reasonable installation of crane wall attaching frame, so as to guarantee the safety of installation and operation; construction of the pier columns for the construction personnel by proper selection of construction methods, so as to guarantee the construction quality of bridge with high piers.
关键词
桥梁高墩
施工方式
施工质量
bridge with high pier
construction method
construction quality