摘要
结合梧桐庄矿井四采区隔断工程设计实践,分析了煤矿井下突水隔断工程选择所需要考虑的主要问题,针对矿井采用独立防水闸门、独立防水闸墙、防水闸门和防水闸墙联合方案进行了分析,对煤矿高水压隔断工程建设具有一定指导意义。
Combined with No. 4 mining area partition engineering design practice in Wutongzhuang Mine, problems of mine water inrush partition project selection were analyzed, independent waterproof gate, waterproof wall, waterproof wall and waterproof gate joint scheme were analyzed, which had some guiding significance for mine high pressure partition project construction.