摘要
2013年底建成开通的衡柳铁路,是广西对外进行客货交流的主要通道,随着客货量的增加,青茅至柳州西段的通过能力制约了衡柳线运输能力的发挥。为解决这一问题,此文通过对青柳段线路主要技术条件的简述,对该段通过能力的计算,以及影响该段通过能力因素的分析,提出优化运输组织,提高货物列车运行速度,减少客货列车速度差等措施,来提高青柳段的通过能力。
Hengliu railway opened by the end of 2013 is the main channel of Guangxi foreign passenger communica- tion. With the increasing of passengers, the Carrying capacity of Qingmao to Western Liuzhou restricts the transport capacity of Hengliu line. To solve this problem, through cal conditions of Qingliu line, calculating the segment through ability, this segment through capacity, The measures that optimizing transport train running speed, reducing the speed difference are put forward, to liu section. briefly stretching the main techni- and analyzing the factors affecting organization, improving the goods improve carrying capacity of Qing-