无砟轨道地段隧道基底加固方案及经济指标分析

The Basal Reinforcement Scheme and Economic Indicators Analysis in the Tunnel Section of the Ballastless Track
下载PDF
导出
摘要 通过铁路有关部门对几类既有隧道的调研发现,铺设无砟轨道的隧道内出现不同程度的病害,其中隧道基底发生病害的概率最高,对其上部轨道结构影响最大,给养护维修带来困难。此文在分析各类隧道基底地质特征,以及30 t轴重列车对隧道结构设计影响的基础上,针对隧道基底承载力不足的问题,结合山西中南部铁路通道铺设无砟轨道的隧道基底底层类别,提出注浆加固隧道基底的方案。并对其工程数量和费用指标进行分析。 Through the survey to several types of the existing tunnel by the railway departments, it is found that it appears different degree of disease in tunnel laying ballastless track. The probability of disease in the tunnel basement is the highest; it has the biggest effect on its upper track structure and brings difficulty to maintenance. Based on the analysis of all kinds of tunnel geological characteristics, as well as 30 t train axle load influence on tunnel structure design, in view of the problem of insufficient bearing capacity of basement for tunnel, combining with the central and southern railway in Shanxi laid ballastless track tunnel basement bottom category, the scheme of the base grouting strengthening tunnel basement bottom is put forward. And its engineering quantity and cost index were analyzed.
作者 高天
出处 《铁路工程造价管理》 2015年第4期54-58,共5页 Railway Engineering Cost Management
关键词 铁路 隧道工程 无砟轨道 地基加固 造价分析 Railway Tunnel engineering BaUastless track Foundation reinforcement Cost analysis
  • 相关文献

参考文献4

二级参考文献9

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部