摘要
分析了当涂电厂2×600MW机组湿式石灰石(石灰)-石膏法烟气脱硫废水的形成以及各种污染物来源,介绍脱硫废水处理系统工艺流程。总结归纳脱硫废水处理系统在实际运行中出现的问题,并对现有工艺处理中出现的问题提出相应的改进措施。
This paper introduces the formation of wastewater and source of various pollutants from the desulfurization gypsum quality control of wet limestone-- gypsum FGD of 2x600 MW in dangtu power plant.The process of wastewater treatment system being presented ,and the problems existing in practical operation being summarized up and concluded. Some improvements and propositions have also been put forward.
出处
《科技与企业》
2015年第15期227-227,229,共2页
Science-Technology Enterprise
关键词
烟气脱硫
脱硫废水
改进措施
flue gas desulfurization
wastewater fromdesulfurization
Improvement measures