苏洼龙水电站建设对土登尼夏林寺的影响分析

Analysis on influence of Suwalong Hydropower Station construction on Tudengnixialin Temple
下载PDF
导出
摘要 苏洼龙水电站左岸坝肩上部现有土登尼夏林寺,由于该工程引水发电系统位于左岸,主要开挖工作面距离寺庙较近,因此,需要开展工程施工对寺庙的影响分析。本文通过对寺庙与枢纽工程的相对位置关系分析,从爆破振动、爆破飞石和爆破冲击波三个方面提出工程爆破控制标准,同时提出了施工期对寺庙需要采取的保护措施。 Tudengnixialin Temple is located in the upper portion of left bank dam of Suwalong Hydropower Station currently. Since water diversion power generation system of the project is located in the left bank,the main excavation work surface is closer to the temple,the influence of project construction on the temple should be analyzed. In the paper,project blasting control standard of the project is proposed from three aspects of blasting vibration,blasting flying rock and blasting shock wave by analyzing the relative location relationship between the temple and hub project. Meanwhile,protection measures necessary for temple during construction are proposed.
出处 《中国水能及电气化》 2015年第7期22-25,共4页 China Water Power & Electrification
关键词 工程施工 寺庙保护 爆破控制标准 保护措施 project construction temple protection blasting control standard protective measures
  • 相关文献

参考文献2

二级参考文献2

共引文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部