节段式预制沉管顶推系统比选与优化 被引量:3

Comparison and optimization for pushing system of sectional prefabricated immersed tube
下载PDF
导出
摘要 节段式预制沉管在顶推过程中各节段间无钢筋或预应力钢绞线连接,容易对节段间剪力键混凝土造成损伤,对顶推设备和顶推同步性要求极高。通过对多种顶推方案的比选,港珠澳大桥岛隧工程预制沉管纵向移动选用了多点步距式顶推技术,并在顶推施工中对顶推系统进行了一系列的优化,保证了预制沉管顶推的安全和效率。 In the pushing process of sectional prefabricated immersed tube, no steel bar or prestressed steel strand connection between the various segments, it is easy to damage the shear connector in joint segment, and the requirements of pusher equipment and push synchronization are very high. Through a variety of pushing scheme comparison, we selected the multi- point interval type pusher technology for the prefabricated immersed tube longitudinal move in the Hongkong-Zhuhai-Macao Bridge island and tunnel project, conducted a series of optimization for the pushing system during pushing construction, and ensured the pushing safety and efficiency of prefabricated immersed tube.
作者 戴书学 游川
出处 《中国港湾建设》 2015年第7期4-7,共4页 China Harbour Engineering
关键词 节段式 预制沉管 顶推系统 比选 优化 sectional prefabricated immersed tube pushing system comparison optimization
  • 相关文献

参考文献4

二级参考文献9

共引文献140

同被引文献7

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部