摘要
从港珠澳大桥沉管安装测量塔定位系统的安装及标定、精度分析、施工定位、全站仪校准、快速静态检测、数据处理、贯通测量复核等各环节,对测量塔法在深水深槽大型沉管安装中的成功应用进行分析,工程实践表明,该方法可以实现全天候连续作业,定位精度高,数据真实,可靠性强,在大型构件的精确定位安装中具有推广价值。
Based on the measuring tower positioning system of Hongkong-Zhuhai-Macao Bridge immersed tube installation, through the control installation and calibration, accuracy analysis, construction-location, total station instrument calibration, fast static detection, data processing, and breakthrough measuring review, we analyzed the successful application of measuring tower method in the construction of large-scale immersed tube installation in deep groove at deep water area. Proved by the engineering practice, the method can realize all-weather continuous operation, high positioning precision, strong reliability in real data. It is worth of popularization in accurate positioning and installation of large-scale components.
出处
《中国港湾建设》
2015年第7期36-38,共3页
China Harbour Engineering
关键词
港珠澳大桥
沉管
安装
测量塔
定位系统
Hongkong-Zhuhai-Macao Bridge
immersed tube
installation
measuring tower
positioning system