大体积混凝土温度应力仿真分析及防裂措施 被引量:9

Temperature stress simulation analysis and crack control measures of mass concrete
下载PDF
导出
摘要 港珠澳大桥西岛暗埋段为大体积混凝土结构,施工前必须根据实际工况对大体积混凝土进行温度应力仿真分析计算。通过应用大型有限元软件MIDAS/Civil,按照港珠澳大桥岛西岛暗埋段的实际尺寸和施工组织计划建立有限元模型进行仿真分析计算,同时考虑施工阶段、大气温度、养护条件、冷却水管、混凝土配合比等设置计算参数,根据计算结果制定了相应的防裂技术措施,以达到提高结构的承载力和耐久性的目的。 The buried section of Hongkong-Zhuhai-Macao Bridge (HZMB) west artificial island is the mass concrete structure. Before construction, we must carry the temperature stress simulation analysis and calculation for mass concrete according to actual conditions, and formulate the anti-cracking technical measures according to the results of the calculation, in order to reach the purpose of improving the bearing capacity and durability of structure. By using large-scale finite element software MIDAS/Civil, according to the actual size and construction organization plan of HZMB west island to establish finite element model for the simulation analysis and calculation, meanwhile, considering the construction phase, atmospheric temperature, curing conditions, cooling water pipe, concrete mixture ratio on setting up the calculation parameters. According to the calculated results, we formulated the anti-cracking technology measures.
出处 《中国港湾建设》 2015年第7期53-56,共4页 China Harbour Engineering
关键词 隧道 暗埋段 大体积混凝土 温度应力 仿真分析 tunnel buried section mass concrete temperature stress simulation analysis
  • 相关文献

参考文献3

二级参考文献12

  • 1管敏鑫.钢筋混凝土沉管隧道在设计与施工中的有关问题[J].现代隧道技术,2007,44(1):1-4. 被引量:5
  • 2ITA Work Group. Immersed and floating tunnels [ J ]. Tun- nelling and Underground Space Technology, 1997,12 (2): 93 - 109.
  • 3The Oresund techinical publication. Tunnel [ M ]. Oresunds- bro Konsortiet, 2001.
  • 4Chris Marshall. The Oresund tunnel: Making a success of design and build [ J ]. Tunnelling and Underground Space Technology, 1999,14(3) :355 - 365.
  • 5W P S Janssen, Steen Lykke. The fixed link across the Ore- sund: Tunnel section under the Drogden [ J ]. Tunnelling and Underground Space Technology," 1997,12( 1 ) :5 - 14.
  • 6W Jassen, P de Haas, Y H Yoon. Busan-Geoje Link: Im- mersed tunnel opening horizons [ J ]. Tunnelling and Under- ground Space Technology,2006,21 (3) : 332.
  • 7L C F Ingerslev. Considerations and strategies behind the design and construction requirements of the Istanbul Strait immersed tunnel [ J ]. Tunnelling and Underground Space Technology, 2005,20 (6) : 604 - 608.
  • 8杨文武.沉管隧道工程技术的发展[J].隧道建设,2009,29(4):397-404. 被引量:34
  • 9梁绍平.钢筋巧加工[J].建筑工人,2010,31(2):32-35. 被引量:1
  • 10邱荣祖,林雄.我国成型钢筋加工配送现状与发展对策[J].物流技术,2010,29(20):33-35. 被引量:13

共引文献41

同被引文献39

引证文献9

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部