沉管安装碎石回填质量控制 被引量:3

Quality control of gravel backfill for immersed tube installation
下载PDF
导出
摘要 碎石回填是沉管安装完成后的一道重要工序,关系到沉管在海底的安全。港珠澳大桥隧道工程的碎石回填作业是在外海、深槽环境下进行,潮流、波浪情况复杂,且施工区处于航道区,船行波影响明显,增加了作业难度。为了保证碎石回填的精度,施工过程中从测深仪、多波束扫测等测量手段入手严加控制,有效保证了回填质量。 The gravel backfill is an important process after the immersed tube installation, it relates to the immersed tube safety under the sea. The operation of gravel backfiU in the Hongkong-Zhuhai-Macao Bridge tunnel project is in the open seas and in deep groove construction, the situation of tide and wave is complex. In addition the construction area is in the channel region, the significant influence of ship traveling wave increases the difficulty of the operation. In order to ensure the accuracy of gravel backfill, we kept the strict control for altimeter, multi-beam sweeping survey, which has effectively guaranteed the backfill quality.
出处 《中国港湾建设》 2015年第7期113-115,共3页 China Harbour Engineering
关键词 沉管 碎石回填 外海 深槽 测深仪 多波束 immersed tube gravel backfill open seas deep trench altimeter multi-beam
  • 相关文献

参考文献3

  • 1港珠澳大桥管理局.港珠澳大桥施工及质量验收标准[s].2013.
  • 2JTJ221-98.港口工程质量检验评定标准[S].[S].,..
  • 3GBFF18314--2009.全球定位系统(GPS)测量规范[s].

共引文献31

同被引文献8

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部