基于FTA-Reason的施工作业高空坠落风险预控研究 被引量:16

Study on pre-control of high falling risk in construction operation based on FTA-Reason model
下载PDF
导出
摘要 为了对施工作业中高空坠落风险进行预控,采用故障树法对施工作业高空坠落事故进行了故障树的构建、分析,继而通过对经典Reason模型进行改造,建立了施工作业高空坠落事故的预控模型,包括组织因素、安全监督、操作条件、安全行为的前提以及安全行为5个防御层次。在风险预控的过程中,通过运用建立的施工作业高空坠落风险模型,可以对施工作业中的高空坠落风险进行针对性地预控,为施工安全风险管理提供参考。 In order to control the high falling risk of construction operation in advance,the Fault Tree Analysis( FTA) method was applied to construct and analyze the fault tree for the high falling accident in construction operation. Through modifying the classical Reason model,the pre- control model of high falling accident in construction operation was established,which included five guarding levels such as organizational factors,safety supervision,operating conditions,premise of safety behavior and safety behavior. In the process of risk pre- control,through using the above model,the high falling risk in construction operation can be pre- controlled pertinently,which can provide reference for risk management of construction safety.
出处 《中国安全生产科学技术》 CAS CSCD 北大核心 2015年第7期171-177,共7页 Journal of Safety Science and Technology
关键词 故障树法 Reason模型 高空坠落 施工作业 FTA Reason model high falling construction operation
  • 相关文献

参考文献13

二级参考文献30

共引文献105

同被引文献138

引证文献16

二级引证文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部