新的亨伯河医院是加拿大最先进的全数字化急症护理中心,医院的设计建造者加拿大PCL承包股份有限公司运用虚拟施工技术,选取项目中可以采用场外施工的构件,放到PCL公司PMC生产基地进行预制。通过采用场外解决方案,节省时间并减少现场关键路径工作的物流和人力压力,同时工厂更可控的环境提高了项目的效率和质量。在模块化业务单元里,BIM的应用非常广泛,将工作按份额划分而不是按专业划分,增加了预制潜力。BIM也使车间的过程更加自动化,将模型连接到计算机数控和其他设备上,从而减少错误,提高效率。
The new Humber River Hospital is a fully digital acute care facility of Canada. Its design- builder PCL Constructors Canada Inc. used virtual construction technology to identify elements of the project that could be delivered as offsite solutions fabricated in PCL's PMC production facility. By taking some of the challenges offsite,PCL was able to assist the schedule and reduce onsite logistical and manpower pressure on critical path activities.Besides,the factory setting provided a much more controlled environment to build in,which increased efficiency and enhanced quality on the project. BIM was used extensively in its modular business unit. BIM helped to identify portions of work,rather than individual trades,which increased the amount of prefabrication potential. It also automated more of the process in the shop,where the model was tied to CNC and other equipment to reduce errors and increase efficiency.
出处
《土木建筑工程信息技术》
2014年第6期112-116,共5页
Journal of Information Technology in Civil Engineering and Architecture