摘要
依托华电莱州电厂500 k V线路送出工程,梳理了该工程海中立塔的设计过程。铁塔采用钢管结构,基础采用高桩承台结构,桩型采用后注浆灌注桩等。该工程两年多的安全运行表明,工程的设计方案是合理的,结构型式安全、经济、可靠,为以后的类似工程提供设计参考。
On the basis of the 500 kV transmission line project of Laizhou power plant,we look back upon the design of the tower on the coast.The tower is of steel-tube construction;the foundation uses high-rise pile cap;as for the pile type,postgrouted pile is adopted.Over two years' safe operation of the project testifies that the tower construction is safe, economical and reliable, which can be used as reference for future projects.
出处
《山东电力技术》
2015年第6期59-61,68,共4页
Shandong Electric Power
关键词
海岸立塔
钢管结构
高桩承台
后注浆灌注桩
tower on the coast
steel-tube construction
high-rise pile cap
pile post grouting