摘要
针对某大型煤化工企业全厂蒸汽系统和凝结水回收利用系统复杂、部分能量未得到合理利用、管道材料浪费等问题,提出优化方案,节约工程投资,降低生产运行成本。
Regarding to the complexity of plantwide steam system and condensate recovery and utilization system, part of the energy not utilized reasonably and piping material wasted in a coal chemical enterprise, an optimizing plan was presented to save the project investment and lower down the operation cost.