期刊文献+

提高某金选矿厂技术指标途径探讨及研究 被引量:2

Discussion and Research of the Way to Raise Index of A Gold Mine Processing Plant
下载PDF
导出
摘要 针对某复杂难处理金矿含金矿物赋存状态及嵌布特征复杂等特点,进行了不同流程方案对比试验,并进行了技术经济比较,最终推荐采用先浸出后浮选技术方案,该项技术可以获得的金总回收率为93.48%,较目前现场工艺提高金回收率19.06个百分点,该项技术如果可以成功工业应用,将不仅大幅提高该企业经济效益,同时对我国类似矿山具有较好的技术借鉴和指导价值。 For a complex refractory gold mine which gold mineral have complex occurrence state and the distribution feature,the study has carried on the test of different process scheme,and makes technical and economic comparison,the final recommended process flow is Flotaiton after cyanidation,the technology can get 93. 48% of the total gold recovery rate,which can improve the gold recovery rate of 19. 06 percentage points comparing with the present technology,this technology can be successful if the industrial application,will not only greatly improve the economic benefits of the enterprise,also has a good reference and guidance value to the similar mines in China.
出处 《有色金属(选矿部分)》 CAS 北大核心 2015年第4期43-45,57,共4页 Nonferrous Metals(Mineral Processing Section)
基金 "十二五"国家科技支撑计划项目(2012BAB08B06)
关键词 金矿石 全泥氰化 浮选 先浸后浮 gold ore all slime cyanidation flotaiton flotaiton after cyanidation
  • 相关文献

参考文献8

二级参考文献59

共引文献65

同被引文献124

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部