锦屏一级大坝首次蓄水过程监测成果分析 被引量:10

Analysis on monitoring data of Jinping Ⅰ hydropower dam during first impoundment
下载PDF
导出
摘要 锦屏一级水电站双曲拱坝是世界已建最高坝,首次蓄水按库水位1 700 m、1 800 m、1 840 m、1 880 m四阶段已成功蓄至正常蓄水位。监测结果表明大坝变形、应力应变、渗流、渗压符合一般规律,量值在设计控制指标范围以内,枢纽工程各建筑物工作性态整体正常;库岸总体安全;水位在1 880 m附近持续1个多月后,各监测数据趋于平稳。 The arch dam of Jinping Ⅰhydropower station is the highest dam in the world. In accor-dance with the established scheme, the reservoir water level has reached normal high water level now.The monitoring result shows that the stress and strain, deformation, seepage, osmotic pressure of dam arein line with the general law, the value is under the designed value. The behavior of the project is normalon the whole and the reservoir bank is stable. The water level of the 1 880 m has lasted more than 1month, monitoring data tends to be stable.
作者 杨弘 董燕君
出处 《大坝与安全》 2015年第3期34-40,共7页 Dam & Safety
关键词 锦屏一级水电站 首次蓄水 安全评价 Jinping Ⅰhydropower station the first impoundment safety evaluation
  • 相关文献

参考文献1

  • 1王继敏,段绍辉,郑江.锦屏一级拱坝建设关键技术问题[C]//中国大坝协会2012学术年会论文集.2012.

共引文献1

同被引文献97

引证文献10

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部