摘要 为了提高机组真空度,改善机组运行经济性,某火电厂300 MW直接空冷机组进行了空冷系统增设空冷散热器的增容改造。改造后,夏季平均工况下汽轮机排汽压力为17.8k Pa,比改造前设计排汽压力(24.9 k Pa)降低了7.1 k Pa。对比分析了改造效果,认为增容改造有利于降低汽轮机运行背压,提高了机组运行经济性。 In order to increase the unit vacuum, improve the economy of unit operation, the air cooling system was added air cooling condenser in a 300 MW direct air cooling unit of a power plant. After the transformation, under the summer average condition, the steam turbine exhaust pressure was 17.8 kPa, the exhaust steam pressure was reduced by 7.1 kPa than the design value(24.9 kPa) before the transformation. Comparison and analysis of effect of the reconstruction, rehabilitation that the reformation could help to reduce the operation back pressure of steam turbine, improve the unit economy.
出处 《内蒙古电力技术》 2015年第3期48-51,共4页 Inner Mongolia Electric Power
关键词 300 MW直接空冷机组 空冷凝汽器 风机 背压 真空严密性 300 MW direct air cooling unit air cooling condenser fan backpressure vacuum tightness
  • 相关文献

参考文献15

二级参考文献47

共引文献56

同被引文献32

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部