多线叠交盾构隧道近接施工模型试验 被引量:22

Model Test on Approaching Construction of Multi-line Overlapped Shield Tunnelling
下载PDF
导出
摘要 多线叠交软土盾构隧道是随地铁建设不断发展而出现的一种复杂隧道空间布置形式.针对多线叠交盾构隧道垂直上、下穿2种典型穿越施工形式,借助室内模型试验,根据盾构隧道近接施工的技术特点和控制要求,采用排液法,重点分析了多线叠交盾构隧道在各穿越阶段下因地层损失和开挖卸荷引起的地表沉降以及既有隧道纵向变形规律.分析结果可为今后类似多线叠交盾构隧道工程的设计和施工提供理论指导. With the unceasing development of the metro construction, multi-line overlapped shield tunnels in soft soil are being built as a complex spatial distribution. For two kinds of typical construction methods of up-crossing and under-crossing, model test research was applied to analysis the dynamic construction process. According to the shield tunneling technology characteristics and control requirements of approac- hing construction, the drainage method was applied to selective analysis of the surface subsidence and the existing tunnel longitudinal deformation caused by formation damage and excavation unloading of multi-line overlapped tunnel at various stages. The research results can provide some theoretical basis and prophase guidance for similar projects in the future.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2015年第7期1040-1045,共6页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(41172238)
关键词 盾构隧道 多线叠交 近接施工 模型试验 shield tunnelling multi-line overlapped approaching construction model test
  • 相关文献

参考文献10

二级参考文献68

共引文献377

同被引文献177

引证文献22

二级引证文献110

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部