深水钻井隔水管紧急脱离后的反冲响应 被引量:15

Recoil response of deepwater drilling riser during emergency disconnection
下载PDF
导出
摘要 深水钻井中,在恶劣海况或浮式平台定位失效等情况下,需紧急断开隔水管与水下防喷器的连接。隔水管突然脱离后会加速向上反冲,如果反冲作用控制不当,可能威胁钻井平台、隔水管体和水下井口的安全。介绍了国外隔水管紧急脱离与反冲响应的研究情况,分析了隔水管紧急脱离的原因与程序、脱离后的反冲过程、反冲控制方式和成功脱离标准、反冲响应的分析方法。建议:由于南海深水海况复杂,作业者需制定紧急脱离的预案和作业规程,并进行紧急脱离操作培训;由于隔水管紧急脱离后的反冲响应涉及多个非线性瞬态过程,研究者应该开展隔水管紧急脱离测试和反冲响应模拟计算,开发隔水管反冲响应分析软件。 In deepwater drilling,marine risers are required to perform emergency disconnection sequence in harsh environments or during loss of dynamic positioning control. Riser recoil response will occur after lower marine riser package is disconnected in emergency. Riser recoil behavior would bring serious dangers to drilling platform,riser body and subsea equipment if recoil velocity is not effectively controlled. Related theories of this issue in the past two decades are summarized,including reasons and procedures of drilling riser emergency disconnection,process and anti-recoil methods of riser recoil,and criterions of successful disconnection. The investigation shows that for drilling in deepwater of the South China Sea, riser emergency disconnection is an indispensable consideration,contingency plans and formal procedures should be seriously established,and special emergency disconnection training is necessary for well drillers. Moreover,recoil response of drilling riser during emergency disconnection is a complex transient process and several nonlinear relations of different systems are involved,yet related researches in China are still in an early stage. Therefore,it is necessary for domestic researchers to implement drilling riser disconnection tests and recoil response calculation researches,and to eventually develop a special recoil response analysis software.
出处 《海洋工程》 CSCD 北大核心 2015年第4期121-127,共7页 The Ocean Engineering
基金 国家自然科学基金项目(51274219)
关键词 钻井隔水管 紧急脱离 反冲响应 张紧器 钻井液下泄 drilling risers emergency disconnection recoil response riser tensioner drilling fluid discharge
  • 相关文献

参考文献22

  • 1GRcNEVIK A. Simulation of drilling riser disconnection-recoil analysis[ D]. Master Thesis of Marine Hydrodynamics Engineering, Norwegian University of Science and Technology, 2013.
  • 2LANG D W, REAL J, LANE M. Recent developments in drilling riser disconnect and recoil analysis for deepwater applications [ C ]//Proceedings of the ASME 28th International Conference on Ocean, Offshore and Arctic Engineering. 2009: 305-318.
  • 3KARISEN G, SIKES J D. 6 000 ft water depth upgrade of the Sonat Discoverer 534 [ C ]//Proceedings of the SPE/IADC Drilling Conference. 1991 : 699-707.
  • 4YOUNG R D, HOCK C J, KARLSEN G, et al. Analysis and design of anti-recoil system for emergency disconnect of a deepwater riser : case study [ C ]//Proceedings of the 24th Annual Offshore Technology Conference. 1992 : 163-171.
  • 5YOUNG R D, HOCK C J, KARLSEN G, et al. Comparison of analysis and full-scale testing of anti-recoil system for emergency disconnect of deepwater riser[ C ]//Proceedings of the 24th Annual Offshore Technology Conference. 1992: 173-182.
  • 6HOCK C J, YOUNG R D. A deepwater riser emergency disconnect antirecoil system [ J ]. Journal of Petroleum Technology, 1993, 45(8) : 744-751.
  • 7PUCCIO W F, NUTYALL R V. Riser recoil during unscheduled lower marine riser package disconnects [ C 1//Proceedings of the SPE/IADC Drilling Conference. 1998: 33-52.
  • 8MILLER J E, STAHL M J, MATICE C J. Riser collapse pressures resulting from release of deepwater mud columns [ C ]// Proceedings of the Offshore Technology Conference. 1998: 543-551.
  • 9STAHL M J. Control recoil in drilling risers after emergency disconnect [ C 1//Proceedings of the ETCE-OMAE Joint Conference. 2000.
  • 10STAHL M J, ABBASSIAN F. Operating guidelines for emergency disconnect of drilling risers [ C ]//Proceedings of the ETCE-OMAE Joint Conference. 2000.

二级参考文献11

  • 1Young R D, Hock C J, Karlsen G, et al. Analysis and design of anti-recoil system for emergency disconnect of a deepwater ris- er: case study[R]. OTC 6891,1992.
  • 2Sten R, Hansen M R,Larsen C M, et al. Force variations on heave compensating system for ultra-deepwater drilling risers the 29th International Con{erenee on Ocean, Offshore and Arc- tic Engineering, Shanghai, June 6-11,2010[C].
  • 3Lang D W, Real J, Lane M. Recent developments in drilling ris- er disconnect and recoil analysis {or deepwater applications:the 28th International Conference on Ocean, Offshore and Arctic Engineering,May 31-June 5,2009[C].
  • 4Shaughnessy J M, Armageost W K, Herrmann R P, et al. Prob- lems of ultra-deepwater drilling[R]. SPE/1ADC 52782,1999.
  • 5James N B. Key elements in ultra-deep water drilling riser management[R]. SPE/IADC 67812,2001.
  • 6Hock C J, Young R D. A deepwater riser emergency disconnect anti-recoil system[R]. OTC 23858,1993.
  • 7Grytoyr G. Marine drilling riser disconnect and recoil analysis [R]. AADE-11-NTCE-80,2011.
  • 8Server Haziri. Development of simulation model for virtual testing and design of a riser tensioner system[D]. Kristian- sand:University of Agder, Department of Engineering, 2011.
  • 9Puceio W F, Nuttall R V. Riser recoil during unscheduled lower marine riser package diseormects[R]. SPE/IADC 39296, 1998.
  • 10赵建亭,薛颖,潘云,程峰.浮式钻井装置隔水管张紧系统研究[J].上海造船,2010(4):1-5. 被引量:17

共引文献20

同被引文献58

引证文献15

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部