复杂地质条件下溶洞处理的桩基施工技术 被引量:1

Pile Foundation Construction Technology of Handling Karst Cave Under Complicated Geological Conditions
下载PDF
导出
摘要 福建省三明市图书馆工程地层地质条件比较复杂,岩溶洞穴发育不均衡、无规律。采用填充32.5R水泥、优质黏土、片石(体积比为3∶1∶1)的方法和灌砂压浆法、钢护筒法相结合的方法处理溶洞,通过桩基静载荷试验,验证了桩基承载力特征值满足设计要求,说明该工程所采用的溶洞处理的桩基施工技术是合理可行的。 The geological structure of the Fujian Sanming library was complex, and the karst cave devel- opment was unbalanced and irregular. The karst cave was treated with the method of the filling 32.5R ce- ment, high-quality clay, stone tablets ( volume ratio of 3 : 1 : 1 ), fifiling sand and grouting, and steel casing. The pile bearing capacity has met the design requirements by pile static load test, which showed that the pile foundation construction technology of handing karst cave was reasonable and feasible.
出处 《常州工学院学报》 2015年第3期1-4,共4页 Journal of Changzhou Institute of Technology
基金 福建省科学技术厅自然科学基金指导性科技计划项目(2012D125) 福建省教育厅A类科技项目(JA12307)
关键词 溶洞 灌砂压浆法 钢护筒法 承载力 karst cave filling sand and grouting steel casing bearing capacity
  • 相关文献

参考文献9

二级参考文献52

共引文献63

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部