随着污水厂排放标准的提高,根据环保部门的要求,康大教育园污水处理厂改造工程最终提高到一级A标准。在改造的过程中;对改造前、后污水处理厂的处理效果进行了对比分析。结果表明,在现有设计改造工程的基础上,现有改造方案取得了明显的效果。
With improvement of the wastewater treatment plant discharge standards, according to the requirements of environmental protection departments, Kangda wastewater treatment plant renovation project eventually increased to the level of Grade ⅠA. In the process of transformation; on the transformation of the former, the sewage treatment plant after treatment effects were compared and analyzed. The results show that, based on the existing design renovation project, the existing scheme has achieved remarkable results.
出处
《广东化工》
CAS
2015年第13期212-212,220,共2页
Guangdong Chemical Industry
关键词
污水厂
升级改造
生化处理
wastewater treatment plant
upgrading and reconstruction
biochemical treatment