期刊文献+

基于BIM的毛石装饰墙虚拟砌筑系统研制 被引量:6

BIM-based Virtual Building System Development for Rubble Walls
下载PDF
导出
摘要 针对某工程项目对毛石装饰墙砌筑要求高导致砌筑工作效率低的问题,本研究基于BIM研制毛石装饰墙虚拟砌筑系统。研制工作以Revit为平台进行二次开发,研制了墙体导入模块、石材图像处理模块和显示模块、毛石墙虚拟砌筑模块以及石材切割图和墙体拼装图生成模块。用户在实际应用时,只需首先对各石材编号并拍照,并将石材照片导入该系统,系统即自动生成相应的矢量图;然后,用户在系统中基于从BIM模型中导入的墙信息和毛石装饰墙的数据,只需要进行移动、旋转及裁剪等交互式操作,进行毛石墙的虚拟砌筑,系统可自动生成石材切割图和墙体拼装图,用以指导施工。本系统的应用,可有效地提高高要求毛石墙砌筑的效率。 A BIM-based virtual building system is developed by customizing Autodesk Revit to increase the efficiency of building rubble walls which is of high demand. The system consists of four modules for importing walls, processing and displaying stone images, virtual construction, and generating cutting diagrams and as- sembly diagrams respectively. In practical use, firstly, users should label numbers on stones, take photos of them and then import the photos into the system, and the system will generate the vector diagrams of each stone automatically. Secondly, based on the information of walls imported from BIM model and the vector diagrams, users construct wails virtually by means of interactive operations, such as movement, rotation and cutting, and the system will generate cutting diagrams of stones and assembly diagrams of wails at the same time which can be used to guide the construction. It is verified that the system could improve the efficiency of constructing rubble walls of high demand.
机构地区 清华大学
出处 《土木建筑工程信息技术》 2015年第2期9-13,共5页 Journal of Information Technology in Civil Engineering and Architecture
基金 本项目系与中信建设有限责任公司的合作项目
关键词 毛石装饰墙砌筑 虚拟砌筑 BIM系统开发 图像处理 Revit二次开发 Rubble Walls Virtual Construction BIM System Development Image processing Customization
  • 相关文献

参考文献8

二级参考文献37

共引文献799

同被引文献43

  • 1罗兰,赵静雅.装饰工程BIM应用流程初探——基于Revit的装饰模型建立和应用流程[J].土木建筑工程信息技术,2013,5(6):81-88. 被引量:41
  • 2隋振国,马锦明,陈东,徐伟.BIM技术在土木工程施工领域的应用进展[J].施工技术,2013,42(S2):161-165. 被引量:98
  • 3Maurice Murphy, Eugene McGovern, Sara Pavia. Histor- ic building information modelling (HBIM) [ J ] . Structur- al Survey, 2009,27(4) :311-327.
  • 4RaffaellaBrumana. HBIM for Documentation, Dissemina-tion and Management of Built Heritage The Case Study of St. Maria in Scariad'Intelvi [J]. International Journal of Heritage in the Digital Era, 2013,2 (3) :433-452.
  • 5AsojoA O. An instructional design for Building Informa- tion Modeling (BIM) and Revit in interior design curricu- lum [ J ]. Art, Design & Communication in Higher Edu- cation, 2013,11 (2) : 143-154.
  • 6C Rudloff,TMatyus,SSeer. Developing Intelligent Interior Design Decoration Components by BIM Technologies [ C ]. Springer International Publishing, HCI International 2014-Posters' Extended Abstracts-HCI International 2014, Heraklion, Crete, Greece, June 22-27,2014. Proceedings, Part I. 2014,101-106.
  • 7Jung J, HongS, JeongS, etal. Productive modeling for de- velopment of as-built BIM of existing indoor structures [ J ]. Automation in Construction, 2014,42 (2) :68-77.
  • 8JimiClarke. BIM Project Audit Checklist [ DB/OL ]. ht- tp ://forums. autodesk, com/tS/revit-architecture/bim- project-audit-checklist/td-p/3924852,2013.
  • 9JungsikChoi, InhanKim. Development of Check-list for BIM Based Architectural Design Quality Check [ J ]. Transactions of the Society of CAD/CAM Engineers, 2013,18(3) : 177-188.
  • 10Autodesk Asia Pte. Ltd.. Autodesk REVIT 二次开发教程[M] . 上海:同济大学出版社,2015: 1-28.

引证文献6

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部