6LIJI SHEN,UDO BUSCHER. Solving the serial batching problem in job shop manufacturing systems[J]. European Journal of Opera- tional Research,2012,221(6) :14-26.
8LARS MONCH,RENE SCHABACKER, DETLEF PABST, et al. Genetic algorithm-based subprohlem solution procedures for a modi? ed shifting bottleneck heuristic for complex job shops[J]. European Journal of Operational Research, 2007, 177 (5) : 2100- 2118.
9CHRISTOS KOULAMAS, GEORGE J KYPARISIS. The three- machine proportionate open shop and mixed shop minimum makespan problems [J].European Journal of Operational Re- search,2014(4) : 1-5.