8Shirakawa M, Nakamoto M, Hosaka S. Dynamic simulation and optimization of start-up processes in combined cycle power plants[J]. JSME International Journal, Series B-Fluids and Thermal Engineering, 2005, 48(1): 122-128.
9Falah A, RalfP, Jochen S, et al. Modeling and investigation start-up procedures of a combined cycle power plant [J]. AppliedEnergy, 2008, 85(12): 1173-1189.
10Wang Weibing, Wang Xudong, Liu Dongju. IP Start-up control for 300MW turbine unit with bypass system [J]. ProcediaEngineering , 2011(16): 493-498.