1Allen S.G.,D.A.D’esopo.An ordering policy for repairable stock items[J].Operations Research,1968,16(3).
2Moore R.Establishing an inventory management program[J].Plant Engineering,1996,50(3).
3R.Dekker,M.J. Kleijn,P.J.de Rooij.A spare parts stocking policy based on equipment criticality[J].International journal of production economics,1998,(56).
7[3]Gajpal P,Ganesh L,Rajendran C.Criticality analysis of spare parts using the analytic hierarchy process[J].International Journal of Production Economics,1994,35:293-298.
8[4]Ramanathan R.ABC inventory classification with multi-criteria using weighted linear optimization[J].Computer and Operations Research,2006,33:695-700.
9[7]R Dekker,MJ Kleijn,PJ de Rooij.A Spare Parts Stocking Policy Based on Equipment Criticality[J].International Journal of Production Economics,1998,56(3):69 ~ 77.
10[8]Chang PL,Chou YC,Huang MG.A (r,r,Q) inventory model for spare parts involving equipment criticality[J].International Journal of Production Economics,2005,97(1):66-74.