摘要
研究基于关键资源优先的单元化"装卸、搬运、装卸"三级作业链的调度问题.在已知关键资源调度方案的条件下,将两个非关键各作业级的调度问题分别转化为最小单位流问题,并建立相应的0/1整数规划模型求解.为求解大规模问题,提出三级装卸搬运的分时协调策略.参照宁波港码头数据,设计面向集装箱码头的仿真算例,实验结果验证了所提出模型和策略的有效性.
The problem of unitized three-stage operational chain for material handling operations with key resource priority conditions is studied, including three sub-processes: loading, unloading and transport. Based on the known scheduling scheme of the key resource, the two non-critical stage scheduling problems are converted into the minimum unit flow problem respectively, and the corresponding 0/1 integer programming models are established. In order to solve the largescale problem, time-dependent clustering and coordination strategies are developed. In the background of real Ningbo port terminal, the numeric study is conducted to verify the effectiveness of the model and strategy.
出处
《控制与决策》
EI
CSCD
北大核心
2015年第8期1441-1446,共6页
Control and Decision
基金
国家自然科学基金重大项目(71390520)
国家自然科学基金重点项目(71390521)
国家自然科学基金面上项目(71101088
71471077)
国家自然科学基金青年项目(71101088)
上海市曙光计划项目(13SG48)
江苏省研究生科研创新计划项目(KYZZ 0041)
关键词
关键资源
单元化装卸搬运
三级装卸搬运作业链
分时协调策略
key material
material handling by unit
three-stage operational chain for material handling operations
time-dependent coordination strategies