摘要
高压架空输电线路的施工安装一般分为四大工序,它们分别是基础施工、杆塔施工、架线施工和接地施工。从线路施工和接地施工两大方面展开讨论。
Construction installation of high voltage overhead transmission line, generally divided into four process, they are foundation construction, tower construction, wiring and grounding construction. This paper discussed the circuit construction and grounding construction.
出处
《贵州电力技术》
2015年第8期86-87,90,共3页
Guizhou Electric Power Technology
关键词
线路施工
高压
架空输电线路
附件安装
接地施工
line construction
high voltage
overhead transmission lines
attachment insta]]ation
ground construction