摘要 牛栏江红石岩形成大型堰塞湖后,及时收集堰塞湖区水文气象和工程设计资料,通过洪水几率、洪水标准、设计洪峰流量和设计时段洪量分析,及时为堰塞湖排险处置提供了洪水分析计算成果,得出堰塞湖在8至9月份发生年最大洪水的几率是大的,为35%;并得出5年和20年一遇的设计洪峰流量,1d、3d、5d、7d设计洪量成果;当发生5年和20年一遇洪水,通过水量平衡方程进行调洪演算来分析堰塞湖的最高洪水位和最大库容,1d、3d、5d、7d设计库容超过堰塞湖最大库容的有6个,漫堰的概率为75%;通过洪水漫堰后淹没、溃堰风险分析,得出风险范围是极大的,在堰塞湖上下游83km的河段,有4213人,6个水电站会受到淹没和溃坝影响。因此,红石岩堰塞湖的排险处置是非常紧迫的。 When great landslide lake was formed at Hongshiyan in Niunan River, the hydrometeorological data and engineering design data of landslide lake area were collected rapidly. Through analysis to flood probability, flood standard, design flood peak flow and the flood volume in designing period, the analysis and calculation results of the flood were provided timely to dispose the risk at Landslide Lake. The results indicated the probability of annual maximum flood in this landslide lake was larger in August and September, which was about 35%. The flood routing on the flood of every 5 years and 20 years was carried out by the water balance equation to analyze the highest flood level and the largest capacity of the lake. The results showed that there were 6 design capacities in 1 day, 3 days, 5 days and 7 days were larger than the maximum capacity of the landslide lake, the frequency of overflowing weir was about 75%. The risk area is great through risk analysis to submergence and breach when flood overflows cofferdam, 4213 people and 6 hydropower stations alone the upstream and downstream of 83 km landslide river reach may be affected by submergence and weir break. Therefore, risk-elimination is urgent for the landslide lake of Hongshiyan.
作者 任继周 赵伟
出处 《水资源研究》 2015年第3期290-295,共6页 Journal of Water Resources Research
关键词 堰塞湖 洪水风险 分析 Landslide Lake, Flood Risk, Analysis
  • 相关文献

参考文献5

二级参考文献23

  • 1陈景秋,张永祥,韦春霞.二维溃坝洪水波的演进绕流和反射的数值模拟[J].水利学报,2005,36(5):569-574. 被引量:12
  • 2柴贺军,刘汉超,张倬元.一九三三年叠溪地震滑坡堵江事件及其环境效应[J].地质灾害与环境保护,1995,6(1):7-17. 被引量:41
  • 3芮孝芳,刘方贵,邢贞相.水文学的发展及其所面临的若干前沿科学问题[J].水利水电科技进展,2007,27(1):75-79. 被引量:31
  • 4武汉大学水利水电学院水力学流体力学教研室.水力计算手册[M].北京:中国水利水电出版社,2006.
  • 5任继周.利用合成流量法预报山区河道洪水有关问题的探讨,见:中国水利学会2003学术年会论文集.北京:中国三峡出版社,2003.
  • 6Giuseppc Mandrone, Aldo Clerici, Claudio Tellini. Evolution of a landslide creating a temporary lake: successful prediction [J]. Quaternary International, 2007(171):72-79.
  • 7Sanjay S. Chauhan, Danvid S. Bowls, Loren R. Anderson. Do current breach parameter estimation techniques provide reasonable estimates for use in breach modeling?[A]. In:Assiociation of State Dam Safety Officials(ASDSO). Annual Cont[C].2004.
  • 8Hirt C W,Nichols B D.Volume of fluid(VOF)method for the dynallnies of flee boundaries[J].Journal of Computational Physics,1981,39(6):201-225.
  • 9Monaghan J.Simulating free surface with SPH[J].Journal of Computational Physics,1994,110(2):399-406.
  • 10Garcia-Navarro P,Vazquez-Cendon M E.On numerical treatment of the source terms in the shallow water equations[J].Computer& Fluids,2000,4(29):951-979.

共引文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部